Bathroom Update–Board and Batten & Framing a Builder Mirror

To contact us Click HERE

bathroom 027

The Board and Batten is up and now the bathroom just needs its final coat of paint.    I used 1 x 6” for the baseboard and 1 x 4” for the top piece and 1 x 3” for the vertical boards.  I topped everything with a 1 x 2” ledge.  It looks so good.  I love that the horizontal pieces are the same width as the vertical pieces. 

I used absolutely no liquid nails on this board and batten.  We just nailed everything into the studs.  I only placed the vertical pieces where the studs are.  We used spackle to fill the cracks and put a thin bead of paintable caulk along all the edges. 

bathroom 026

We beveled the board and batten on the edges that end near the mirror.

bathroom 022

This is what our floor looked like after all the sanding.

bathroom 025

We framed the mirror. Here’s a side by side of the mirror.

Builder Grade Mirror DIY Frame Before & After

It still needs to be sanded, caulked and painted.  It’s really hard to photograph the mirror and the light is crazy bright.

Here’s how we framed the mirror. 

Builder Grade Mirror DIY Frame

I used a 1 x 4 the width of the mirror for the top and bottom.  On top of the bottom 1 x 4 we placed a 1 x 2 on top of that to form a small ledge.  Use 2 1 x 3’s to run the length of the mirror and place the other 1x4 on top of them.

Here’s the new light.

bathroom 012

It should be finished this week.  Wahoo!!